Newport Coast, CA
Kitchen remodel: full gut and island reconfiguration

A whole-kitchen gut renovation completed while the homeowners remained in the house. CRS Construction kept the job site clean and contained throughout, replacing the cabinetry, countertops, backsplash, and finishes, including two rounds of finish changes mid-project. CRS paid special attention to the island placement to improve traffic flow and the overall feel of the space, and the window view became a natural focal point of the finished design. The house is slightly older, and gutting the kitchen turned up evidence of water damage behind the sink wall and a bit of mold. CRS went through remediation for the mold, which set the timeline back a couple of days. CRS also moved the gas line for the stove to a new wall and ran a new water supply line for the fridge. The homeowner designed the kitchen with help from CRS's designer.
Project photos
Project details
Did the homeowners live in the house during this Newport Coast remodel?
Yes. CRS Construction kept the job site clean and contained throughout the project so the homeowners could remain in the house during construction rather than needing to relocate. That meant daily cleanup, careful containment of dust and debris, and coordinating trade schedules to minimize disruption to daily life in an occupied home. Staying in the house during a full kitchen renovation is common for homeowners who want to avoid the cost and hassle of temporary housing, and it is something we plan for from the start of the project rather than treating as an afterthought.
Did the design change during the project?
Yes, the homeowners made two rounds of finish changes mid-project, and the team accommodated both without derailing the overall timeline. Separately, mold remediation after the gut added a couple of days to the schedule. Mid-project changes are not unusual once cabinetry and countertops are physically installed and homeowners can see finishes in the actual space rather than in samples or renderings, since real lighting and proportions sometimes shift preferences. Accommodating two separate rounds of changes took flexible scheduling with the trades involved, but kept the homeowners in control of the final look rather than locking them into decisions made before installation began.
What turned up when the Newport Coast kitchen was gutted?
When we gutted the kitchen, we found evidence of water damage behind the sink wall and a bit of mold. Any large job turns up something unexpected, especially in a slightly older house like this one. We went through remediation for the mold, and that set the timeline back a couple of days.
What was the design focus?
The homeowner designed the kitchen with help from our designer. Island placement was central to the design, since repositioning it improved traffic flow through the kitchen, with the existing window view becoming a natural focal point of the finished space once the layout was adjusted around it. Rather than treating the window as a fixed constraint, the redesign built the island position and sightlines around taking advantage of that view. This kind of layout-first approach, where furniture and fixture placement is planned around an existing architectural feature rather than against it, is typically what separates a kitchen that feels intentional from one that simply has new finishes. With the walls open, we also moved the gas line for the stove to a new wall and ran a new water supply line for the fridge.